SunSynk 8kW Solar System With 5.2kw Blue Nova Battery Fully Installed
Photovoltaic Panels | |||
9 | JAM72S-30-540-MR | JA Solar 540W Mono PERC Half-Cell MBB | |
Inverters | |||
Mounting Kit | |||
28 | REN-420131 | VarioSole Bracket M10 offset connection | |
4 | REN-420081 | End Clamp+ 30 - 50mm Silver | |
16 | REN-420082 | Middle Clamp+ 30 - 50mm Silver | |
28 | REN-400602 | Renusol Seam Clamp KL+ | |
4 | REN-920044 | VarioSole + End Cap 50X37 rail - RIGHT/LEFT Grey (1 pair) | |
6 | REN-400532 | VarioSole+ Rail connector for rail 50 x 37 mm | |
8 | REN-400528 | VarioSole+ Mounting rail 50 x 37 x 3300mm | |
Cable | |||
1 | CABLE-6-100-R | 6mm2 single-core DC cable 100m - Red | |
4 | MC4-CONN14-2-PACK | MC4 Connector Twin Pack ( Kit 1 ) 0014/0015 | |
1 | CABLE-6-100-B | 6mm2 single-core DC cable 100m - Black | |
Switches | |||
2 | KG41-T203-GBA270 | K&N Single Phase AC Switch Disconnector 40A | |
Meters | |||
Display | |||
Labels | |||
1 | BOHAZARD-SET | PV on Roof and Hazard Labels Pack | |
1 | SUN-8.0 | Sunsynk Sun 8K Hybrid Inverter | |
1 | DCB-NF-2I-600V-I16A-I_II-2O | 600V Protection Box 2 Inputs 2 Outputs 16A Isolator Type I_II SPD | |
1 | ACDB-I60A-230V-II-32AO | AC Protection Box - For <7kVA Inverters - 32A Out Single Phase | |
1 | SUN-CAN-3M | CAN BMS Cable 3m for Sunsynk with US2000C / US3000C and UP5000 | |
1 |
BN52V-100-5.2k BP |
Blue Nova Rac Power BN52V-100-5.2k BP |
|
2 | CABLE-70-1-HV-PAIR | 70mm2 single-core HV DC cable 1m - Pair | |
1 | KETO-1-200A | KETO 1 Battery Disconnector with 200A Fuses | |
2 | LUG70-8 | 70mm2 Cable Terminal Lug M8 - Single |
Full Installation Notes
- Installation offering for JHB, Port Elizabeth, Alexandria, Cape Town, Pretoria, Durban, Pietermaritzburg and within 50kms of those main centers.
- No extreme angle roof types (>30 degrees) and no slate roof types that may require slate kits.
- Extra will have to be charged if panel lifts are required or ladder rental for very high roofs.
- Offer assumes that installation point is within 20M from mains db board.
- Mains DB must have an existing Certificate of Compliance, extra will have to be charged if a COC needs to be done.